Mobile
Log In Sign Up
Home > chinese-english > "basement wall" in English

English translation for "basement wall"

地库墙;地下室墙
基础墙


Related Translations:
basement:  n.1.建筑物的底部。2.【建筑】底层;地下室 〔cf. cellar〕.
basement rock:  基底基岩
basement first:  地下第一层
basement ray:  地下室水枪
basement soil:  底层土壤基土
basement floor:  地下室层零米标高
sub basement:  下层地下室
basement tanking:  地库防水层;地库防水工程地库防水工程
basement area:  地下掩蔽部
basement concourse:  地下中央大厅
Example Sentences:
1.The front basement wall was pushed in slightly, but was not cracked except at the ends .
地下室前墙稍被向内推进一点,除两端外并未裂开。
2.The basement walls suffered some damage, mostly in the rear i.e., away from the explosion .
地下室的墙壁受到一定程度破坏,主要在背面,亦即背向爆炸的地方。
3.Application of polypropylene fiber concrete in construction of basement wall panel of taizhou unicom mansion
聚丙烯纤维混凝土在泰州市联通大厦地下室墙板工程中的应用
4.One very determined brother , who had masonry skills , succeeded in stopping the leak that came through the basement walls
一位决心十足的师兄凭他的泥砖技术成功地堵住了漏水嗯!
5.In these years , with the increase of the number of high - rise building in cities , temperature cracks of basement wall draw more and more public attentions . how to solve this problem has become a difficult nut in the engineering practice and needs urgent solutions to meet engineering demands
近年来,随着高层建筑的兴建,地下室侧墙温度裂缝这一问题越来越引起各方面的重视,如何防止高层建筑地下室侧墙开裂是工程界急需解决的难题。
6.As a sub - topic of " cracking mechanism and a whole set of control technique of modern concrete , structure " ( no : 50278031 ) supported by national natural science foundation , this paper studies ail - roundly and systematically temperature crack controlling technique of basement wall of high - rise building and puts forward the solution methods into the theoretical calculation and construction practice
本文作为国家自然科学基金“现代混凝土结构裂缝机理及成套控制技术” (编号: 50278031 )的子题之一,对此问题进行了全面的、系统的研究,从理论计算和施工实践两方面提出了解决方案。
7.By analysis and study , the methods of controlling the thermal crack in basement wall have been summed up in design , material supply and construction . these methods have been applied in wuxi development building basement wall project , and a series of efficient measures methods have been proposed
通过分析研究,在设计方案、材料要求、施工措施等方面总结了地下室侧墙温度裂缝控制的整套技术,并对无锡太湖发展大厦地下室侧墙工程进行分析研究,提出了一系列有效的施工建议。
8.The main work done in this paper is as follows : ( 1 ) simulate the temperature field of basement wall by ansys software , sum up the characteristics of the temperature field of basement wall , and analyze the influence of the types of the molding board , environmental change and cement content ; ( 2 ) the whole simulation analysis process of early - age concrete stress field is realized by sub - development of ansys , and cts - ansys software is developed with fortran ; ( 3 ) based on the cause of cracking , the influence of the thickness of the wall , length , bar arrangement , mix proportion , expanding agent , etc , on the wall stress due to concrete creep and temperature change is analyzed
本文主要进行了以下几个方面的研究: ( 1 )利用ansys软件,模拟了施工期地下室侧墙温度场,总结了地下室侧墙温度场分布的特点,分析了模板类型、环境变化和水泥用量等对墙体温度场的影响; ( 2 )以大型通用有限元软件ansys为平台进行二次开发,运用visualfortran语言编写了cts - ansys程序,实现了施工期混凝土徐变温度应力的仿真计算; ( 3 )从裂缝形成的原因出发,分析了地下室侧墙厚度、长度、配筋率、配合比、膨胀剂等因素对墙体徐变温度应力的影响。
Similar Words:
"basement tectonics" English translation, "basement terrane" English translation, "basement transcurrent fault" English translation, "basement type" English translation, "basement uplift" English translation, "basement water proofing" English translation, "basement wedge" English translation, "basement window" English translation, "basement-cover relationship" English translation, "basement-membrane" English translation